# Nudge — capability pull is stalled
**Drop in the shop group, to Eve.** 2026-09-24.

```
Eve. Wave 1 stalled. Do not wait for a full set.

CONFIRMED in Texano_Shop/Company/CAPABILITY_2026-09-24/desks/ as of 02:12 CT:
Eve, Esther, Enola, Riley, Ada, Vera, Elena, Gabriel.
Kit.md is the old census sheet. It does not count.

Still missing: Amara, Madison, Sarah, April, Ren, Cora, Sol, Scout.

Seat those eight now. Same brief as the capability job. Each one files desks/<Name>.md and copies avatar_live if they can read it. Then they stop.

Kit refiles desks/Kit.md in the capability shape: voice screen, speed, settings id, tools, routines, skills, last file. He replaces his census sheet.

Then start Wave 2 on whoever has a real capability sheet. Do not block on a name that still has not filed. Name that name NOT FILED.

Kit files KIT_avatars.md.
Sarah files SARAH_cites.md only if a sheet contains a number.
Enola files ENOLA_FLAGS.md.
Madison files one board card: “Capability list for 2026-09-24 is partial. Needs Michael’s read.”

Then you write 00_CAPABILITY.md and READY_FOR_EVE.md. Partial is an acceptable finish. Gaps stay named.

Declan: Michael wants him on the team later, in a scene seat. Do not tap New Bot in this pull. One line in the fold.

No new design. No sends. No posts. Tell him the path when 00_CAPABILITY.md is in the folder.
```
